Login
You are here: Home > Proposed Projects

Proposed Projects

Below is a list of proposed projects. Click on the project to see detail about the project.

 Click here to propose a New Project.

 Click here to Search Projects and Change Selection Criteria.

Status definitions:
Submitted – new project ideas not yet evaluated by the review team
Forming – Projects being readied for submission to CTMA program
On-hold – Project ideas being delayed (see comments section for specifics)
Rejected – Project ideas not accepted for CTMA program (see comments section)


ID FY Project Title Status
Status: Submitted
37FY06 Integrated System for Reading Visible and Hidden Data Matrix Marks Submitted
72FY07 Modernizing Legacy Tech Data Packages - 2D Raster to 3D CAD Submitted
93FY07 Computed Radiography Field Level Crack Detection Submitted
94FY07 Arc Fault Circuit Breakers (AFCBs) Submitted
95FY07 NDI of Honeycomb Bonded Structure Submitted
96FY07 Flexible Conformal Eddy Current Probes Submitted
98FY07 ASIP – CBM+ Enterprise Predictive Analysis Environment (EPAE) Submitted
99FY07 Fiber Optics Repair Submitted
100FY07 Complex Programmable Logic Device (FPGA) Tech Insertion: A Tool for Obsolescence Management Submitted
101FY07 Plastic Media Blast Masking Process Improvement Submitted
102FY07 Improvement of High Power Amplifiers for Legacy EW Systems: A Solution for DMSMD & Obsolescence Submitted
103FY07 Integration of Structural Health Monitoring Capabilities into existing fleet to enable CBM+ Submitted
104FY07 Restoration of Dimensional Tolerances Submitted
105FY07 Implementation of Risk-based Inspection Intervals to Reduce Inspection Burden Submitted
107FY07 Tier 1 LO Material Multifunction Inspection System (LOMMIS) Transition Submitted
108FY07 Quality Data Analysis and Prescriptive Metrics (QDAPM) Submitted
109FY07 Adhesion Technology for Fluid Contaminated Surfaces Submitted
111FY07 Demonstration/Transition/Implementation of Care-Free Hybrid Structures to increase fleet reliability Submitted
114FY07 Advanced Plastic Media Initiative Submitted
115FY07 Masking Process Improvement for Rapid De-Paint Preparation Submitted
118FY07 Advanced Systems Sensors for Semi-automated Stripping Units Submitted
119FY07 Corn Starch Polymer Paint Stripper Submitted
121FY07 Rapid Off-Aircraft Landing Gear Test Sensor Submitted
122FY07 Reliability Maintainability Supportability Engineering Database/Portal Submitted
123FY07 Work Flow Analysis Submitted
125FY07 Air Separation Module Submitted
127FY07 Side Stripping System Initiative Submitted
130FY07 Enhance Jamming and Situational Awareness Capabilities Submitted
131FY07 Enhance Jamming and Situational Awareness Capabilities-2 Submitted
132FY07 Acquisition Support Model Submitted
133FY07 Seamless Fastener Hole Repair (Friction Plug Welding) Submitted
134FY07 Process Guide-Data Capture & Work Flow Mgt Submitted
136FY07 AFRL Centric Effort: Enhanced Structural Maintenance Planning Capability Submitted
137FY07 ALC Centric:
Enhanced Structural Maintenance Planning Capability
Submitted
139FY07 Lifecycle Management Process Submitted
140FY07 Enterprise Predictive Analysis Environment (EPAE) Submitted
141FY08 Material Management Container Location & Movement Tracking Submitted
143FY08 Non-Skid Removal on MIP/SHT Submitted
145FY08 Puget Sound naval Shipyard Technology Infusion Submitted
146FY08 High Strength LCP Reinforced Deck-Edge Netting for Marine Environment Submitted
147FY08 CLEANER STRUCTURAL RIPOUT METHODS Submitted
148FY08 LOW HEAT INPUT WELDING TECHNIQUES Submitted
149FY08 FOUNDATION LAYOUT AND PLACEMENT Submitted
150FY08 Portable Water Filtration System Submitted
151FY08 Paint Hose temperature control Submitted
152FY08 Portable Laser Crawler to Remove Coatings Submitted
153FY08 Portable Water Filtration System Submitted
154FY08 Environmental Boundary System
Submitted
155FY08 Removal of MBT Damping and Acoustic Treatments Submitted
156FY08 Removal Special Hull Treatment (Mold-In-Place) Submitted
157FY08 Sound Damping Removal Submitted
158FY08 Removal Special Hull Treatment (Mold-In-Place) Submitted
160FY08 Central DoD CAD model repository Submitted
161FY08 On-board, in-situ repairs of aluminum components Submitted
162FY08 In place, long-lasting weld clad repair of ASW / MSW Valves. Submitted
163FY08 NDI for Hidden Crack and Corrosion Damage in Multilayered Aircraft Structures Submitted
164FY08 NDI - Flexible Fastener Hole Perimeter Scanner System Submitted
166FY08 Coating Removal Process for GTEs Submitted
167FY08 Plastic Media Blast Masking Process Improvement Submitted
168FY08 Improvement of High Power Amplifiers for Legacy EW Systems: A Solution for DMSMD & Obsolescence Submitted
169FY08 UV Cured Coating for Use on Radomes Submitted
170FY08 Advanced NDE Bolt Hole Ultrasonic Testing (BHUT) Inspection Submitted
Status: Forming
4FY06 Inspection and Repair Preparation Cell (IRPC) Forming
65FY07 Volumetric Accuracy of Large Machine Tools Forming
67FY07 Laser Projection of Camouflage and Stencil Patterns Forming
74FY07 Replacement for Hexavalent Chromium in Surface Finishing Processes – Phase II Forming
81FY07 Enhanced Wiring Integrity System Phase II Forming
82FY07 Metal Finishing Development Program Forming
83FY07 Modernization of Nickel Electroplating at Depots Forming
Status: Active
22FY06 Sense and Respond Logistics Development of Comprehensive Secondary Repairable Legacy Platform Readiness Capability (LAV III) Active
61FY06 Centralized Fleet Automated Management System (CFAMS) Active
66FY07 AP&IG - Automated Process and Inspection Guide Active
84FY07 Handheld Oil FluidScan for Rapid Field Assessment of Equipment Condition Phase II Active
135FY07 Erosion / Corrosion Resistant Coatings for Gas Turbine Engine Compressor Systems Operating in both Sand and Maritime Environments Active
Status: Rejected
69FY07 Technology Insertion Lifecycle Execution (TILE) Rejected
75FY07 ViSmart™ Solid-State Bolt-Plug Oil Viscosity Sensor Rejected
76FY07 Thermal Drilling Application Development - Bill Charron, Ford Motor Company Rejected
86FY07 OilCheckIR® In-field Oil Analysis Solution
Phase II
Rejected
112FY07 Hard Chrome Plating Using Selective-Plating Trivalent Chrome Rejected
128FY07 Automated Inspection/Process Guide Rejected
Status: On Hold
1FY06 Assembly Design and Documentation Phase II On Hold
11FY06 Smart Machines Phase 3 Project (SMP3P) On Hold
60FY06 AUTOMATED TOOL CONTROL INVENTORY TRACKING On Hold
64FY07 Configuration Change Management Pilot On Hold
77FY07 Casting Knowledge Re-use based Cost Advisor Phase II On Hold
78FY07 Deployable Vehicle Air Filter Cleaning Equipment On Hold
79FY07 Greater Utilization of Aqueous Parts Washers (APWs) Throughout DoD On Hold
80FY07 Costing Advisor for Forgings and Stampings On Hold
85FY07 Failure Prediction of Critical Equipment On Hold
87FY07 Durable Tank Preservation On Hold
92FY07 Aircraft composite analysis via rugged handheld Point-n-shoot FTIR On Hold